Queensway House, Milton Keynes

November 2017 – M&E – £500,000

Queensway House was formally a 3-story office building in Bletchley, Milton Keynes. Developers had been tasked by the client to transform this building into 38 new 1 and 2-bedroom apartments. Working with the main contractor, Elite Contracting Limited took the projects mechanical and electrical package on a design and build basis from a performance specification. We were able to design, install and deliver all 38 apartments, including 5 new timber frame penthouses located on the roof. This existing plot came with some logistical difficulties due to the car park next door still being in use by other tenants and nearby businesses,Nevertheless our skilled engineers and dedicated project management team overcome the challenges and delivered the following;

Electrical 

  • Pre and post construction CAD work for client approval
  • New three-phase BNO low voltage electrical system to 38 apartments
  • Complete Landlords and tenants electrical systems
  • Communal power and lighting systems
  • External lighting systems
  • Part F compliant ventilation

Mechanical

  • Pre and post construction CAD work for client approval
  • Installation of new gas fired combination boilers to 38 apartments
  • Wet heating systems within apartments
  • Supply and fit of bathroom and en-suite sanitary ware
  • Supply and fit of aqua panelling within bathrooms and en-suites
  • Above ground drainage inc SVP rising stacks
  • Installation of incoming mains cold water pipework with custom build metering manifold

Other

  • Installation of communal fire alarm system
  • Installation of audio access control system
  • Installation of IRS freeview system
  • Installation of BT infrastructure

Design

Electrical

Mechanical

Queensway House
Date

11th December 2017

Client

City Renovations

Category

Electrical, Mechanical, New Build